Human resource development and children & women welfare
Education
Standard of education in this Hill district is by and large is much below the state average. Out of total no. of 72420 children 64003 are school going, 6006 are school drop outs and 2411 are in colleges.
Altogether from LP to College level there are 919 institutions with a total enrolment of 66414 students. The student teacher ratio is 1 to 16. The infrastructural constraints have been felt in pursuing education in all stages. This includes the improvement and construction of school/college buildings and boundary walls for security measures. The infrastructure may further include the educational and accomodational items in the school buildings. With the constant involvement of the N.C.Hills District Autonomous Council there has been perceptible development work. For want of adequate fund this could not be achieved up to the optimum expectation.
Constraints
The major constraints are:
i) Non existence of sufficient number of educational institutions.
ii) Non-availability of school hostels.
iii) Non availability of educational infrastructure like building, boundary, benches and other educational tools.
Gap
To meet up the gaps with the SDA under RSVY we have proposed for construction of girls hostel, additional class rooms, RCC library, reading room, brick boundary wall under 20 nos. of projects with a financial involvement of Rs.4,00,000.00 for 3 years.
Impact
There will be several benefits if the projects are completed within 3 years i.e. within 2007 as scheduled.
Following are the impacts.
i) 66414 children will get education.
ii) 300 hostellers will be accommodated.
iii) Security measures are being taken by constructing brick boundary walls to avoid encroachment of school land.
BRIEF STATEMENT OF THE SCHEMES FOR THE YEARS 2004-05
|
Sl. No. |
Scheme/Project |
Total requirement of funds |
Time required for completion |
Phasing of expenditure (on a quarterly basis) |
Targets fixed on a quarterly basis |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
1. |
Construction of 50 seated Girls Hostel for Haflong Govt. College in N.C.Hills |
Rs.40,00,000.00 |
1 years |
25% |
25% |
|
2. |
Construction of Addl. Class room building attached to Haflong Govt. College(G.Floor) with 3 storied foundation in N.C.Hills |
Rs.60,00,000.00 |
1 years |
25% |
25% |
|
3. |
Improvement and renovation of Maibang H.S.School building at Maibang. |
Rs. 6,00,000.00 |
1 years |
25% |
25% |
|
4. |
Improvement and renovation of existing buildings of Haflong Govt. College in N.C.Hills |
Rs.8,00,000.00 |
1 years |
25% |
25% |
|
5. |
Improvement and renovation of Langting Govt. M.E. School at Langting, N.C.Hills |
Rs.5,00,000.00 |
6 months |
50% |
50% |
|
|
Total |
Rs.11900000.00 |
|
|
|
N.B. :- As advised present photographs of the institutions proposed for renovation and improvement will be maintained before the work starts.
BRIEF STATEMENT OF THE SCHEMES FOR THE YEARS 2005-06
|
Sl. No. |
Scheme/Project |
Total requirement of funds |
Time required for completion |
Phasing of expenditure (on a quarterly basis) |
Targets fixed on a quarterly basis |
|
1 |
2 |
3 |
4 |
5 |
6 |
|
1. |
Construction of 3 storied R.C.C. building for library/reading room, administrative block, Professors Common Room, ant deptts. Room at Haflong Govt. College in N.C.Hills |
Rs.50,00,000.00 |
1 years |
25% |
25% |
|
2. |
Improvement and renovation of existing buildings of Haflong Govt. Boys H.S.School, N.C.Hills |
Rs.5,00,000.00 |
1 years |
25% |
25% |
|
3. |
Improvement and renovation of existing buildings of Haflong Govt. Girls H.S.School, N.C.Hills |
Rs.5,00,000.00 |
1 years |
25% |
25% |
|
|
Total |
Rs.6000000.00 |
|
|
|
N.B. :- As advised present photographs of the institutions proposed for renovation and improvement will be maintained before the work starts.
BRIEF STATEMENT OF THE SCHEMES FOR THE YEARS 2006-07
|
Sl. No. |
Scheme/Project |
Total requirement of funds |
Time required for completion |
Phasing of expenditure (on a quarterly basis) |
Targets fixed on a quarterly basis |
Remarks |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
1. |
Reconstruction of building of Govt. M.E. School at Harangajao, N.C.Hills |
Rs.8,00,000.00 |
1 years |
25% |
25% |
Existing building is in dilapidated condition. |
|
2. |
Improvement and renovation of Gunjung Govt. M.E.School Bldg. at Gunjung, N.C.Hills |
Rs.4,00,000.00 |
6 months |
50% |
25% |
|
|
3. |
Improvement and renovation of Jatinga Govt. M.E.School Bldg. at Jatinga, N.C.Hills |
Rs.4,00,000.00 |
6 months |
50% |
50% |
|
|
4. |
Improvement and renovation of Laisong Govt. M.E.School Bldg. at Laisong, N.C.Hills |
Rs.5,00,000.00 |
6 months |
50% |
50% |
|
|
|
Total |
Rs.2100000.00 |
|
|
|
|
N.B. :- As advised present photographs of the institutions proposed for renovation and improvement will be maintained before the work starts.
WELFARE OF WOMEN & CHILDREN
|
The department of Social Welfare in North Cachar Hills has been playing an important role in social upliftment of the weaker sections to effectively address some of the social issues like Welfare of Women, Old Age Persons, Orphans, Disabled and handicapped, adolescent girls, and other weaker sections of the society by implementing beneficiary oriented and target specific schemes within the limitations and constraints of annual plan fund. The scope per se being vast and compelling because of the need. The limitation imposed by the availability of resources, to undertake and implement projects and programmes for the whole sections, and to sustain such programmes for a period of time to economically uplift the needy, could not be achieved. The North Cachar Hills district is the most backward district of the state with low rate of rural literacy, none too satisfactory economy, and large number of unemployed, non proliferation of technology and its geographical location, all too have contributed to the district being an underdeveloped district with its social problems. |
Demographically the women constitute half of the population of the district, but the status of the women is reduced to providers and producers. producers. This is yet to be the realization of the treating them as individuals with human dignity. The children, especially the rural ones totally lack even the bare minimum of need of nutrition, health care or educational opportunities. Yet, to take care of adequate well being of the children, the women has to be educated, motivated and made self sufficient to stand up to the challenge of bringing up a healthy family where the needs of the children and the old aged, and for that matter, the family as a whole. This proposal under RSVY proposes to fill in this critical gap in the regular planning process, by upgrading their natural skill in Weaving to make it economically viable, and sustainable in the long term, thus creating a permanent source of income for this vulnerable group of people in the rural and semi urban areas of the district as per norms of SGSY.
OBJECTIVES :-
1. To create awareness among the women targeted.
2. Upgrade the weaving skill of women in appropriate technology.
3. To generate income through the weaving activity.
4. To improve managerial ability for management of growth activities for their employment.
5. To provide modern weaving technology and marketing abilities.
PROJECT AREA :-
The project area will be the targeted women in a manner from the rural areas of North Cachar Hills district.
PROJECT COMPONENTS :
1.Training in Basic orientation.
2.Formation of Self Help Groups, provision of revolving fund.
3.Training in skill upgrading on handloom weaving.
4.Assistance for provisions in weaving assets and equipments.
5.Provisions for forward and backward linkages.
6.Project monitoring.
Training in basic orientation.
Though the women have been playing an important role in the family, they are not given any importance in society and matters relating to the affairs of the family. So it is proposed to organize training camp for basic orientation about their status and to create awareness in literacy, maintaining basic principles of hygiene to prevent poor health of the family, especially the children, and to encourage group activities by identifying leaders from among them and to build up leadership qualities in the target group. A total of 2500 nos. of women fro 250 batches would be provided training in these fields which are to be organized at Block Headquarters and the duration of such training will be 3 days and resource personnel will be invited to conduct such awareness training.
Formation of SHGs
After the training as indicated above, Self Help Groups of the targeted women would be formed and necessary assistances would be provided by the department in forming the SHGs and managing the same. The SHGs thus formed would take up productive employment as per their own skill in weaving activities in a sustainable and economically rewarding manner which with guidance and self confidence in their own abilities, can provide for them employment round the year. The SHGs after they have been properly trained and motivated would be able to take up the procurement of raw materials, market for finished products in manner of daily activities.
Skill Up-gradation Training :
Tribal women are known for their natural expertise in weaving. By suitably training them and making them aware of the potential of modern weaving technique on Fly shuttle frame loom and jacquard machine attachment as designing equipment these women could upgrade their natural abilities and enable them to produce materials which will have a wider market acceptability and will be sustainable in the long term.
|
The training would for two months and the Master trainer in Handloom weaving and design would be engaged to impart the training programme at different places of the district. |
Support to Individual Beneficiaries.
(i) Provision of Loom and Accessories :- The beneficiaries would be
provided with Fly shuttle frame loom and jacquard machine (5 Nos. per SHG will all accessories for taking up production) and 10% of the cost will be arranged by the SHGs by themselves or through credit from financial institutions.
(ii) The beneficiaries would be provided with a work shed to take up production. The shed would be of the dimension of 10X10” bamboo wall with GC sheet roofing which will cost Rs. 10000 per shed and 10% of the cost will be borne by the SHGs.
Assistance to the SHG :
250 Nos. SHGs would be assisted by giving them some tools and equipments for modernization and adoption of new technology in weaving and design development within a total of Rs. 25,000/- per SHG. In addition 146 Nos. comparatively weaker SHGs will be assisted with more incentive as required under SGSY norms.
Forward and backward linkage :
The SHGs would be provided raw materials to its member and also arrange to market the finished product through showroom at different places and marketing through other agencies. They would be helped in participating in Expos and other exhibitions. The beneficiaries would be provided with share capital of Rs.2000/- each for arranging credit facilities from banks.
Support from other departments : Necessary helps and assistances would be sought from the department of Handlooms and Textiles, DRDA etc. and Government departments and agencies would be impressed upon to procure the fabrics produced by the SHGs to help in their marketing efforts.
Project implementation :
The project would be implemented by the District Social Welfare Officer, N.C.Hills, Haflong under the supervision of the District Level committee of the RSVY.
Involvement of PROs and NGOs.
The Elected Members of the Autonomous Council would be actively involved in the selection of the beneficiaries and implementation of the project. The active NGOs working in the district would also be involved suitably during the course of implementation of the project.
Funding :
The project would be funded by the Planning Commission, Govt. of India under the scheme of RSVY and 10% contribution from the beneficiaries-either self or credit from the bank and will be executed as per SGSY norms.
TRAINING ON BASIC ORIENTATION
No. of Trainees : groups of 50nos. at a time for a duration of two days.
|
Venue |
1st Year |
2nd Year |
3rd Year |
Total |
|
1. Maibang |
6 groups |
4 groups |
4 groups |
14 groups |
|
2.Mahur |
4 groups |
3 groups |
1 groups |
8 groups |
|
3.Diyungmukh |
4 groups |
3 groups |
3 groups |
10 groups |
|
4.Harangajao |
4 groups |
3 groups |
3 groups |
10 groups |
|
5.Sangbar |
4 groups |
3 groups |
1 groups |
8 groups |
FORMATION OF SELF HELP GROUPS (SHGs)
|
It is proposed to form the Self Help Group consisting of 10 Members each to make it efficient and focused. The break up of SHGs Block wise is as under. :- |
|
Sl. No. |
Name of Block |
No. of SHGs |
1st Year |
2ndYear |
3rdYear |
Total |
|
1. |
Maibang |
65 |
30 |
25 |
10 |
650 |
|
2. |
Mahur |
45 |
20 |
15 |
10 |
450 |
|
3. |
Diyungmukh |
50 |
20 |
15 |
15 |
500 |
|
4. |
Harangajao |
45 |
20 |
15 |
10 |
450 |
|
5. |
Sangbar |
45 |
20 |
15 |
10 |
450 |
|
6. |
Total |
250 |
110 |
80 |
60 |
2500 |
REQUIREMENT OF FUND TO BASIC TRAINING OF 50 MEMBERS IN A BATCH FOR 2 DAYS.
1. T.A. and D.A. to Trainees @ Rs. 50/- per day Rs. 5,000.00
Rs. 50 x 2 x 50 nos.
2. Honorarium to resource persons @ Rs. 500 per day Rs. 4,000.00
X4 nos for 2 days.
3. Hall rent @ Rs. 500 x 2 days. Rs.1,000.00
4. Contingency for Mike and others for two days Rs.2,000.00
Total Rs. :-12,000.00
FUND REQUIRED FOR 2500 NOS. OF BENEFICIARIES FOR
BASIC ORIENTATION TRAINING
1. Basic orientation training of 2500 in batches : @ Rs. 12,000/- per 50 trainees.
1st Year Rs. 2.64 Lakhs
2nd Year Rs. 1.92 Lakhs
3rd Year Rs. 1.44 Lakhs
Total Rs. :- 6.00 Lakhs.
2. Fund required for skill up gradation training.
Total trainees = 20 nos. i.e. two SHGs duration two months.
(i) Wage compensation to the Weavers @ Rs. 30 per day X 25
working days x 2 months x 15 nos. of trainees. Rs. :- 22,500.00
(ii) Honorarium to Master Trainer @ Rs.5000 P.M x 2 months
Rs. :- 10,000.00
(iii) Cost of raw materials @ Rs. 500 per trainees x 20 Nos.
Rs. :- 10,000.00
(iv) Accommodation and contingency etc. Rs. :- 4,000.00
@ Rs. 2000 x 2 months. Total Rs. :- 46,500.00
Fund required for 250 SHGs (Year wise)
Skill upgradation of 20nos. (2 SHGs) @Rs. 74,000/-
1st Year Rs. 23.00 Lakhs.
2nd Year Rs. 20.12 Lakhs.
3rd Year Rs. 15.00 Lakhs.
__________________
Total Rs. 58.12 Lakhs.
Fund required for individual supports. ( Rs. in lakhs.)
1. Looms and Accessories @ Rs. 6000 x 2500 :
1st Year Rs. 60.00 Lakhs.
2nd Year Rs. 50.00 Lakhs.
3rd Year Rs. 40.00 Lakhs.
Total Rs. 150.00 Lakhs.
2. Jacquard machine @ Rs. 4,000/- x 1500 Nos.
1st Year Rs. 21.00 Lakhs.
2nd Year Rs. 16.92 Lakhs.
3rd Year Rs. 22.00 Lakhs.
Total Rs, 60.00 Lakhs.
3. Work shed @ Rs. 8155.00 x 2500 beneficiaries of 250 SHGs.
1st Year Rs. 67.50 Lakhs.
2nd Year Rs. 71.38 Lakhs.
3rd Year Rs. 65.00 Lakhs.
Total Rs. 203.88 Lakhs.
4. Fund required for SHG.
(i) Common facility equipments @ Rs. 25,000 per SHG for 250 SHG with additive assistance to 146 SHG.
1st Year Rs. 27.00 Lakhs.
2nd Year Rs. 20.00 Lakhs.
3rd Year Rs. 15.00 Lakhs.
Total Rs. 62.50 Lakhs.
(ii) Share capital assistance @ Rs. 2000 x 2500
1st Year 2,000 x 1100 beneficiaries. Rs. 22.00 Lakhs.
2nd Year 2,000 x 800 beneficiaries Rs.16.00 Lakhs.
3rd Year 2,000 x 600 beneficiaries Rs. 12.00 Lakhs.
Total Rs, 50.00 Lakhs.
FINANCIAL OUTLAY OF THE PROJECT. (Rs. In Lakhs)
|
Sl.
|
Particulars |
2004-05 |
2005-06 |
2006-07 |
Total |
|
1. |
Basic orientation Training |
2.64 |
1.92 |
1.44 |
6.00 |
|
2. |
Skill Upgradation. |
23.00 |
20.12 |
15.00 |
58.12
|
|
3. |
Looms and Accessories. |
60.00 |
50.00 |
40.00 |
150.00 |
|
4. |
Jacquard machine |
22.00 |
16.00 |
22.00 |
60.00
|
|
5. |
Work shed |
67.50 |
71.38 |
65.00 |
203.88
|
|
6. |
Fund for SHG CF Equipment |
27.50 |
20.00 |
15.00 |
62.50 |
|
7. |
Share capital Assistance |
22.00 |
16.00 |
12.00 |
50.00 |
|
Grand total |
224.64 |
195.42 |
170.44 |
590.50 |
|
IMPACT : (Direct Benefit )
i.) 2500 women from the most vulnerable sections would be benefited on completion of the project in three years.
ii) Dependable income to the 2500 families for life.
iii)Through production of handloom fabrics, indirect benefits to sale, marketing personnel.
iv) Export potential of tribal fabrics being great, the venture would bring in foreign exchange for the country.
(Indirect ) – Benefit to persons dealing in Yarn and cloth.
SOCIAL BENEFIT : Improvement in the status of women and assured income would usher in a peace and contentment in the families thereby bringing in harmony in the society.
Khadi & Village Industry :
The activities falls under Khadi & Village Industries sector is very much familiar to rural people. In fact traditional and conventional methods practiced by rural people to produce their various day to day necessary articles are categorized as Khadi & Village Industry. Departmental responsibility is to educate and to encourage the village people for setting up Khadi & Village Industry Units in their respective villages with the aim of making money as well as to create self employment generation environment.
Under the RSVY Programme Khadi & Village Industries schemes will be executed through S.H.G.s. A total number of 960 numbers of unemployed persons will be benefited by implementing this scheme. Expenditure of 70% would be born by RSVY fund and 30% would born by the beneficiaries themselves.
Programme Proposed
1. Bee-Keeping :
Bee-Keeping has been recognized as very much suitable and profitable trade in the N. C. Hills District. Without the cost of raw materials and maintenance, Honey can be produced upto limitless quantity. Every person is crazy for the taste of Honey. Still the customers demand is high in the whole Country. Therefore Bee-Keeping Scheme will be materialized in the District.
Implementation of this scheme will be conducted in 2 phase. First phase is Training & Demonstration and Second Phase is production of Honey.
2. Fiber Industry :
Fiber Industry means production of various goods by using various fibers as raw materials available in the jungle. Items like Floor Mate, Door Mate, Katha, Brush, Brooms, Bags, Decorative Items etc. can be produced by setting up Fiber Industry Units. This is a pollution free unit.
Implementation of this scheme will be conducted in 2 phase. First phase is Training & Demonstration and Second Phase is Production of various goods.
3. Cane & Bamboo :
Cane & Bamboo is available in the jungle of N. C. Hills District. A huge quantity of bamboo is being damaged every year during the process of Jhum Cultivation. For a productive purpose those bamboo can be used. And therefore Cane & Bamboo Product Industry will be set up in the District under the RSVY Programme for creation of employment opportunity.
Implementation of this scheme will be conducted in 2 phase. First phase is Training & Demonstration and Second Phase is Production of various goods.
Detail Scheme of Khadi & Village Industries
Table No. 1.
|
Year |
Sl. No. |
Scheme |
Unit Cost (In Lakhs) |
Qantity |
Total ( Rs. In Lakh |
Remarks |
|
2004-05 (1st Year) |
1.
2.
3. |
Bee Keeping : (Training & Demonstration and Honey Production) Fibre Industry : (Training and production of Mate, Brush, Broom, Bag etc.) Cane & Bamboo : (Training and production of Furniture, Decorative Items, House hold utensils) |
0.80
0.54
0.50 |
12 Groups
10 Groups
10 Groups
|
9.60
5.40
5.00 |
Each SHG will comprise of 10 Nos. of beneficiaries.
Total 320 Nos of beneficiaries will be benefited every year in the District. |
|
|
|
Sub Total |
|
|
20.00 |
|
|
2005-06 ( 2nd Year ) |
1.
2.
3. |
Bee Keeping : (Training & Demonstration and Honey production) Fibre Industry : (Training and production of Mate, Brush, Broom, Bag etc.) Cane & Bamboo : (Training and production of Furniture, Decorative Items, House hold utensils) |
0.80
0.54
0.50 |
12 Groups
10 Groups
10 Groups |
9.60
5.40
5.00 |
|
|
|
|
Sub Total |
|
|
20.00 |
|
|
2006-07 ( 3rd Year ) |
1.
2.
3.
4. |
Bee Keeping : (Training & Demonstration and Honey Production) Fibre Industry : ( Training and Production of Mate, Brush, Broom, Bag etc.) Cane & Bamboo : (Training and production of Furniture, Decorative Items, House hold utensils) Marketing & Transportation Cost for the previous years product |
0.80
0.54
0.50
3.50 |
12 Groups
10 Groups
10 Groups
---- |
9.60
5.40
5.00
3.50 |
|
|
|
|
Sub Total |
|
|
23.50 |
|
|
|
|
Grand Total |
|
|
63.50 |
YEARWISE PHYSICAL AND FINANCIAL TARGET PROPOSED
Physical : Numbers
Financial Rs. in Lakhs
|
Scheme Proposed |
2004-05 |
2005-06 |
2006-07 |
Total |
||||
|
Phy. |
Fin |
Phy. |
Fin |
Phy. |
Fin |
Phy. |
Fin |
|
|
1. Bee-Keeping 2. Fiber Industry 3. Cane & Bamboo |
32 Nos. SHG’s (320 persons) |
20.00 |
32 Nos. SHG’s (320 persons) |
20.00 |
32 Nos. SHG’s (320 persons) |
23.50 |
96 SHG’s (960 persons) |
63.50 |
|